The changes to the Energy Savings Opportunity Scheme (“ESOS”) announced in July 2022

August 4, 2022


Download our full ESOS Phase 3 guide

What has happened?

The government is under pressure on many fronts, not least of them being the state of the environment and, specifically, its commitment to get to Net Zero by 2050, (whatever that may mean).

In an effort to increase the carbon reductions being made by companies, the government issued a public consultation on ESOS last year, and have just published their intended changes to the scheme.

These changes have not yet been fully specified, but they have been outlined.  As such, some of what is included in the paper may change in the fullness of time.

[/et_pb_accordion_item][/et_pb_accordion]

[/et_pb_column][/et_pb_row]

What’s changing in ESOS Phase 3 (2023)?

The government has proposed that the following changes will apply for ESOS Phase 3:

  1. A new section of the ESOS report that will have to include the compliance related information in a specific templated format.Action required: None, the Enistic platform will automatically generate this for you.

2. The amount of data that you can include without any investigation or analysis has halved from 10% to 5% of your total energy use.

Action required: Most Enistic clients have good records and will be below the new threshold anyway.  1 or 2 will need to improve their record keeping in fringe areas which is typically where these problems lay, for example fork-lift use, oil based heating in occasional buildings etc.

3. Reporting an energy intensity, such as XYZ kWh per sqft.

Action required: None, Enistic do this anyway as a matter of routine.

4. Sharing the final ESOS reports with subsidiaries.

Action required: In most cases companies share the information with all parts of the group anyway (including subsidiaries) so no further action is required.

5. Action plans

a. Provide more information about the next steps to be taken to reduce energy use; and

b. Set out a plan on how you will reduce your energy use; and

c. Report back next time (2027) on your success (or otherwise) in meeting the targets set out in the plan

Action required: With most clients, we will need to formulate an action plan with you to reduce your energy.

For clients on a Science Based Targets or TCFD track you will not need to do anything as these aspects are already adequately covered.

For clients on a Carbon Reduction Plan or PPN 06/21 track, we will need to work with you to ensure that the projects defined in the Enistic platform truly represent of what you intend to do as this will be checked in 2027.  We will contact you later in the process to ensure this task is carried out correctly and your resultant carbon reduction plan stands up to scrutiny.

6. Collecting and disclosing far greater deal of detail surrounding your estate and energy use.  This includes how many sites you have, what energy savings measures you have implemented already, the split of your energy by fuel type, by site, what type of buildings you have in your estate, etc.

Action required: We will need to discuss some of these aspects with you in more detail but as the Enistic platform already automates much of the required additional analysis, the majority of Enistic clients are in a good place and well prepared to fulfil these additional obligations.

7. Increased scrutiny of the quality of your ESOS Assessment and the work of your ESOS Lead Assessor.

Action required: None.  We’re pleased to say that as Enistic is a Tier 1 provider of ESOS Services, Enistic easily pass any scrutiny in this regard.

8. Not really announced last week, but please remember that the Environment Agency have increased their maximum level of fines to £235,000 and have changed to a “fine first, ask questions later” model.

Action required: Please don’t ignore the ESOS process.  We will help you through it and do the majority of the required analyses but, with these additional requirements, it will take time and if you allocate insufficient resources to it or leave it too late you may have difficulties meeting the deadline (5th December 2023).



Learn about Enistic

What is happening in ESOS Phase 4 (2026/27)?

Frankly, it’s anyone’s guess.  The changes announced last week are a good starting point but fail to address the carbon reduction problem, focussing primarily on only energy reduction.

To illustrate this, consider one of my clients that takes over 1,000 business class flights each year to the Far East.  None of the flights or the associated carbon of hotel stays, entertaining clients, or taxi fares are considered in ESOS.   So long as they reduce the electricity used in their buildings and reduce their occasional drives between offices or to UK clients, they will be seen as whiter-than-white in respect of ESOS whereas this is clearly not the case.

As such, we should expect the inclusion of other carbon factors to be brought in to either ESOS Phase 4 or SECR.  It’s somewhat perplexing that they have been omitted so far, so look out for them next time.

As ever, if you have any questions, please don’t hesitate to ask and once the changes are finalised I will update you again.

Darryl Mattocks.


Download our full ESOS Phase 3 guide

Book a free consultation

Contact one of our Net-Zero experts today and book a free consultation to see how Enistic can help you set your Net Zero strategy. We will make the processing time and cost-effective. ensuring you move forward, informed, empowered, and confident that you have control.

Book a demo

Talk to our team to:

  • Explore how Enistic is effectively used by companies to track, analyse, and report their carbon emissions.
  • Discover seamless methods for data gathering and integrating Enistic into your team's daily workflow with minimal disruption.
  • Seek custom solutions and receive tailored support.
  • Explore pricing options suitable for your company and your needs.

Our Latest Blog Posts

SECR Software vs Carbon Accounting for UK PLCs

Most UK PLCs do not have a SECR problem. They have a data problem that shows up once a year in the annual report. Streamlined Energy and Carbon Reporting (SECR) sets the legal minimum for quoted companies: global Scope 1 and 2 emissions, energy use, an intensity ratio...

Who Can Help With CSRD Compliance in the UK

The EU's Omnibus I package has cut the number of companies caught by the Corporate Sustainability Reporting Directive (CSRD) by roughly 90%. For UK businesses, that has turned the question around. It is no longer "how do we comply?" but "do we need to, and if so, who...

How to Build a Supplier PCF Data Survey in 2026

Most supplier data surveys fail in a predictable way. You send a request to four hundred suppliers. Ninety reply. Of those ninety, a third send a corporate emissions figure instead of a product one. Several attach an environmental product declaration for a similar but...

SORP 2026: What The New ESG Reporting Rules Mean For Your Charity

If your charity's financial year started on or after 1 January 2026, your first SORP 2026 reporting year is already underway. That matters, because the data your trustees will need to report is being created right now. It's sitting in your energy bills, travel claims,...

SECR Software vs Carbon Accounting Platforms: Which Should UK Manufacturers Choose?

If SECR is the only emissions obligation your business will ever face, dedicated SECR software will do the job. Very few UK manufacturers are still in that position. Customers are sending Scope 3 questionnaires. EU buyers want embedded emissions data. Public sector...

Blues Go Green: Measuring the Carbon Footprint of a Birmingham City Matchday

Ask most football clubs how much carbon a matchday produces, and they could probably give you an estimate. However, very few could give you a measured number. Blues Go Green set out to change that. What is Blues Go Green? Blues Go Green is a partnership between...

How To Get Supplier PCF Data for EPDs and LCAs

You have commissioned an EPD. Data has been collected. The LCA practitioner starts building the model and comes back with a list: this supplier figure covers different modules, that one was calculated under the previous version of the standard, this one has expired,...

ESOS Phase 4 Costs and Deadlines in the UK for 2026

Most organisations think of ESOS as just an audit, a signature, or a notification, often filed and forgotten for four years. The ones getting value from it treat the audit as the input to something else. Phase 4 asks you to identify cost effective energy savings...

How to Measure Supply Chain Emissions for CSRD

Measuring your supply chain emissions and producing a CSRD ready disclosure are two different jobs, and the second one is where most programmes stall. A number in a spreadsheet is not a disclosure. Under CSRD you have to justify why you reported that category at all,...

What Is Scope 3 Emissions Measurement in 2026

Scope 1 and Scope 2 are, by comparison, easy. You own the boilers. You pay the electricity bills. The data exists somewhere in your organisation and someone can go and find it. Scope 3 is different, because it sits almost entirely in other people's businesses. Your...
Loading...
BICS Application £35 to £40 per MWh off your electricity bill, every year for five years. Government relief for UK manufacturers. Applications run from 1 October to 30 November 2026.Check if you qualify
+